WIPs, FOs, & Plans.

May 7, 2008

It was inadvertently brought to my attention last night that I haven’t really been blogging about my WIPs or FOs. Partly this is because I’m scatterbrained lately, and partly that I haven’t been working on anything worth yapping about. Last month I did a couple Christmas presents, and have the rest somewhat sorted out in my head, though most of them require yarn I don’t have. Other than that I made snuggles. I’m still making snuggles. I’m on the 5th, and I think the last I’ll do for a little bit, since I’m out of charity yarn after this one. I’m finding that the Cat Mat (Rav link) pattern by Kris Percival from Speed Knitting is a really nice snuggle pattern. It’s interesting to look at, quick, requires enough attention that it doesn’t lead to deadly boredom, but not so distracting that I can’t knit it while reading.

For a non-secret FO, I finished the million-triangle kitty crescent. Which the cats actually use, amazingly. At first Vree would just lay next to it, but after a week I’ve seen both snuggled up sleeping away on it. Of course, the camera is never handy at the time, so maybe this falls under “screenshot or it didn’t happen.” Either way, it completely emptied my scrap bags — both the “for stuffing” bag and the “maybe big enough for something itty” ball bag. I also chopped up the horrid Lion Homespun I’ve had up on Ravelry for trade since I’ve been there and used that to complete the stuffing. All the yarn scraps are wrapped up in one of Shawn’s old, stained t-shirts so the little yarn bits don’t escape.

This past week, though, I’ve mostly been knitting away at grocery bags. I’ve knit two different patterns so far, and have several left to try, before I pick out the elements I prefer.

Also on the needles right now are my Wicked Spirogyra for the WoW Knitters KAL. I picked up the yarn (Cascade Sassy Stripes, which so far is really nice to work with, if not as mindblowingly pretty as handpainted stuff) for these at Sip ‘N Knit in Maitland after seeing Wicked. Everything about them is about friendship.

And there’s Shawn’s (Easter – snort) socks that I’m only working on when I’m out, which isn’t often enough to make any great progress. I’m finally to the heel flap of the first one. I bet it’ll be until Summer of Socks starts that I really settle in and finish them.

So that’s 3 things on the needles (4 if you count the Pi that is still in need-yarn limbo), one that I’ll finish today or tomorrow (the snuggle), and two that have specific times dedicated to working on them. Next thing up is finally, finally starting the Ribs and Lace Tank (Rav link) with my KP Shine Worsted, hopefully to be finished in time, and come out well enough, to wear it to the Stitch ‘N Pitch.

Maybe I’ll even remember to blog about it.

For now I’m going to go find a skein of sock yarn to buy with our incentive check.

Just one.

I swear.

(Wish me luck.)

Advertisements