Are you a good sock or a bad sock?
March 13, 2008
The Stash Knit Down challenge for the month is to knit up sock stash. I was really excited about it, and swooped through my first pair really quickly.
But I’m working on a sock right now that I’m hating. I don’t know if it’s the yarn, or the color, or the pattern, or that they’re charted, or something else. But normally I get through a pair of socks in a few days to a week. I’m still on the first sock of this pair, not even to the toe, and I started it on the 5th. And they’re footlets. My last pair of footlets took 3 days.
The last socks were wonderful, though. Really fun to knit once I got a hang of the lace repeats, and beautiful. The yarn was perfect. I love them. I wouldn’t mind knitting more.

Pattern: Pumpkin Vine Socks by f. pea
Yarn: Cherry Tree Hill Supersock Merino
I shortened the leg a bit, afraid they wouldn’t go over my calves. If I knit them again, I’ll probably go smaller needles or smaller size and do the full leg length. They’re a lot stretchier than I expected.
I suppose the plus side of trying to get through a bad pair of socks, is that while stalling, rather than start other projects, I tend to learn stuff.
Like provisional cast on.

And Intarsia.

I always thought I’d do Fair Isle first, but apparently not. Necessity, and all that… I’m using up a bunch of cotton scraps for a snuggle.
I’ve also gotten a lot of kitchen knits done, but no pictures, yet. I’m waiting for the “set” to be finished.
Time to see if I can get to the toe without falling asleep. Hopefully the second sock is less obnoxious, somehow.












April 7, 2008 at 12:10 am
[...] been making snuggles. I’ve got two Bun/Kitten ones done (14×14), including the intarsia [...]
April 8, 2008 at 3:29 am
[...] 8, 2008 Okie, so the March SKD Challenge went… so-so. I knit through half my sock yarn stash rather than all of it, and started [...]